15 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 7.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
1 Opening(s)
12.0 Year(s) To 20.0 Year(s)
15.00 LPA TO 20.00 LPA
1. EHS inspection & all regulatory compliance2. Liaison with GPCB / CPCB / MoEF / DISH, etc, as to obtain EC, NOC, CC&A and also handling of public hearing.3. To lead the SHE improvement projects.4. ETP troubleshooting. Ensure ETP operations and maintain statutory records in order to comply with environmental ...
20 Opening(s)
1.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
5 Opening(s)
2.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 10.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 4.00 LPA
ROLE/LEVEL
S.N.
RESPONSIBILITIES
ACCOUNTIBILTY
REMARK
Instrument technician
1
Check all plant weighing Scale Calibration and Pelt from condition.
2
Check all plant bag filter purging system and timer.
3
Attend related instrumentation breakdown in shift.
4
Check all instrument and instrument parameter.
5
Check all plant Pneumatic valve and SOV.
6
Check all plant temp. Sensor.
7
Carried out all Pr. GAUGE, Temp. Controller, temp. Sensor and Pr. Transmitter ...
1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
5 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 7.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 8.00 LPA
Manage all PSM related activities
Manage all Site EHS related matters – Scorecards, incident, Risk, audit, regulatory and Emergency Response management:
Organize and administer programs and procedures to ensure compliance with both regulations and Corporate/Site Standard Operating Procedures.
Conduct internal audits of environmental compliance to regulatory requirements and company policies.
Interact within various site ...
5 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.50 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
1 Opening(s)
3.0 Year(s) To 4.0 Year(s)
2.00 LPA TO 4.00 LPA
ROLE/LEVEL
S.N.
RESPONSIBILITIES
ACCOUNTIBILTY
REMARK
Instrument technician
1
Check all plant weighing Scale Calibration and Pelt from condition.
2
Check all plant bag filter purging system and timer.
3
Attend related instrumentation breakdown in shift.
4
Check all instrument and instrument parameter.
5
Check all plant Pneumatic valve and SOV.
6
Check all plant temp. Sensor.
7
Carried out all Pr. GAUGE, Temp. Controller, temp. Sensor and Pr. Transmitter ...