1 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 8.00 LPA
Operation and Monitoring:
Manage and supervise the daily operation of coal-fired boilers and associated equipment, including fuel handling systems, combustion controls, and emission control systems.
Monitor boiler performance parameters (pressure, temperature, flow rates, etc.) and make necessary adjustments to optimize efficiency and reliability.
Ensure adherence to standard operating procedures (SOPs) and safety protocols.
Analyze ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
i) Shall be ITI / NCTVT passed in SECOND Class BoilerAttendant course with hands on experience of 3-5 yearsin Coal fired Boilers of 20 TPH and above.j) Shall know filled operations of Boiler accessories, ESP,Wet Scrubber, Coal and Ash handling system etc.k) Shall have hands on experience of maintenance of ...
8 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
8 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
a) Shall be ITI / NCTVT passed FIRST Class Boiler Attendantcourse with hands on experience of 4-5 years in Coalfired Boilers of 20 TPH and above.Note: Opening in there in both HP & LP AFBC as well asCFBC boilersb) Shall know operations of ESP, Wet Scrubber, Coal andAsh handling system ...
10 Opening(s)
2.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 5.00 LPA
1.
Operation of Gas fired Boiler
2.
Operation of Gas fired TFH
3.
Operation of Water & Brine Chiller
4.
Operation of Reciprocating & Screw Air Compressors
5.
Monitoring Utility equipment parameter and logging into log book
6.
Keeping Utility machineries clean & in good condition
7.
Updating daily report for utility parameters
8.
Quarterly thermic fluid oil sampling for statutory requirement
9.
Boiler Moberly testing and ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
5.00 LPA TO 10.00 LPA
a) Shall be BE Mechanical or DME and having passed BoilerProficiency Engineer.b) Hands on experience of 3-5 years in Coal fired Boilers of20 TPH and above operations and maintenance.c) Shall know operations and maintenance of ESP, WetScrubber, Coal and Ash handling Plant system etc.d) Shall have hands on experience of ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Operation and maintenance of ‘AFBC’ Boiler and auxiliary, Operation andmaintenance of balance of plant Like : CHS, AHS, CT, WTP.
Operation and maintenance of ‘AFBC’ Boiler and auxiliary, Operation andmaintenance of balance of plant Like : CHS, AHS, CT, WTP.
Operation and maintenance of ‘AFBC’ Boiler and auxiliary, Operation andmaintenance of balance ...
1 Opening(s)
5.0 Year(s) To 15.0 Year(s)
5.00 LPA TO 10.00 LPA
To supervise, schedule and control Coal & Ash management activities.
To ensure timely unloading of Coal.
To ensure timely sampling of Coal from yard as well as boilers
To take of total/complete responsibilities of operation activities of Energy Centre.
To ensure 100% disposal of Ash.
To ensure timely completion of SAP activities.
To identify weak areas ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
10.00 LPA TO 18.00 LPA
1.Manage the maintenance department that provides technical, project management, emergency response, trouble shooting and preventativemaintenance support for process related equipment.Develop, maintain, and justify the departments' budgets3.Coordinate and perform scheduled maintenance on facility equipment to support facility-operating requirements boilers, chillers, environmentalplans, reports and permits in compliance with manufacturer’s recommendations and state ...