1 Opening(s)
4.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
Sr. No
Details
1
Capex:
1) Collaborate with Users & Buyers to create & implement procurement strategies for CAPEX purchases and categories of spend.
2) Should be responsible for Capex procurement of (To Be Defined)
2
OPEX Purchase:
1) Arranging timely procurement and supply of all Engineering consumables, boiler fuel & utility consumables and spares of specified quantity ...
1 Opening(s)
0 To 0
4.50 LPA TO 4.50 LPA
Work with HR managers and specialists and ask questions to ascertain proper practices.
Provide administrative support on the online system by keeping employee records up to date and accurate.
Create and implement an efficient filing system both hard copy and on the internal system.
Liaise with employees and external candidates to provide support ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
I. Summary
Operate and monitor all equipment on the Boilers, Turbine/Generators, Steam System, and Water System. Perform all the duties in the control room.. Maintain proper water chemistry. Perform other duties as outlined by supervisor or lead person and relieve boiler operator and fuel pusher during break periods.
II. Duties and Responsibilities
To ...
5 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 6.50 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
5 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 5.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
5 Opening(s)
3.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 6.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
1 Opening(s)
4.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 7.00 LPA
MAJOR GOALS
MAJOR TASKS
1. PM adherence > 90%
Carry out regular maintenance work as per scheduled plan
2. Breakdown
Improve and Increase overall equipment effectiveness by providing timely delivery of service
Cost effective modification to reduce maintenance cost to minimum
3. Employee Involvement
Ensure proper usage of PPE during execution of job
Ensure proper risk assessment done before start of any ...
1 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 4.00 LPA
Main Responsibilities? Good knowledge of repair and maintenance of process equipment like Pumps, Reactors,ATFD, ANFD, RVPD, RCVD, Powder transfer system, RO system, etc.? Good knowledge of utility equipment maintenance like Steam boiler, Air compressor, N2 gasgeneration plant, Thermic fluid heaters, Multiple effect evaporator, Cooling tower, Chillingplant, brine plant, vacuum system, ...
2 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 5.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
1 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 4.00 LPA
Main Responsibilities? Good knowledge of repair and maintenance of process equipment like Pumps, Reactors,ATFD, ANFD, RVPD, RCVD, Powder transfer system, RO system, etc.? Good knowledge of utility equipment maintenance like Steam boiler, Air compressor, N2 gasgeneration plant, Thermic fluid heaters, Multiple effect evaporator, Cooling tower, Chillingplant, brine plant, vacuum system, ...