1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 6.00 LPA
Experienced in Operation & maintenance of utilities like coal fired boiler, Coal fired thermic fluid heater, Screw chiller for chilled water, Screw chiller for Glycol, Process Chiller, Inst Air Compressor, Air dryer, N2 Generation plant, Cooling tower, Pumps, Blowers, Water Supply, Softner plant, Coal Handling system, Ash Handling system etc. ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 5.00 LPA
We have requirement of Engineering Utility foreman. Area of experience required as per below details :
Knowledge of preventive maintenance all type Pumps & blowers
Experience in operation & maintenance of air compressor & chillers
Experience in Thermic fluid heater & boiler
Capable to manage work shop & utility fitters & welder
Knowledge of ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.
Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
2 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 4.50 LPA
Operation & Maintenance. Of AFBC Boiler, BFP, Air compressor, Ash handling system, coal plant. Well versed in electrical maintenance functions in a DCS , PLC operated continuous process plant, Knowledge of VFDs will be desirable.
Should have worked on Preventive Maintenance & Latest Condition Monitoring systems, Periodic overhauling of Electrical machines ...
4 Opening(s)
2.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 6.00 LPA
Electrical Maintenance of 33 KV, Sub Station DG sets. Look after Utility Maintenance of TNT, PETN, CBT Plants installed PCC, MCC, UPS, Air compressor, Chillers. Electrical installation, Preventive, corrective, breakdown maintenance. Ensure the safe operation of electrical equipment in the facility. Resolving electrical Malfunction, repairing faulty equipment. Maintaining technical ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...