2 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 5.00 LPA
Responsibility A,B,C,& G shift work handing, polymer testing ,raw material testing ,in-process testing, utility samples -water, steam and ETP water testing and general chemical testing, instrument handling: GC,UV,KF,AUTO Titrator, Moisture balance flame photometer and etc.
Responsibility A,B,C,& G shift work handing, polymer testing ,raw material testing ,in-process testing, utility samples -water, ...
4 Opening(s)
2.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 6.00 LPA
Electrical Maintenance of 33 KV, Sub Station DG sets. Look after Utility Maintenance of TNT, PETN, CBT Plants installed PCC, MCC, UPS, Air compressor, Chillers. Electrical installation, Preventive, corrective, breakdown maintenance. Ensure the safe operation of electrical equipment in the facility. Resolving electrical Malfunction, repairing faulty equipment. Maintaining technical ...
1 Opening(s)
6.0 Year(s) To 15.0 Year(s)
5.00 LPA TO 15.00 LPA
Proper Understanding and Knowledge to troubleshoot Process and UtilityEquipment’s like Compressor, Chiller, Cooling Tower, water Treatment Plant. Knowledge of Preventive Maintenance and Breakdown Maintenance. Shift Handling in Maintenance. Good Understanding of the Documentation. Should be Involved in MTTR (Mean Time to Repair) and MTBF (Mean TimeBetween Failure) Improvement Projects. ...
1 Opening(s)
18.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 50.00 LPA
🛠️ Key Responsibilities
Plant Maintenance & Reliability
Lead Mechanical, Electrical & Instrumentation maintenance for all plant equipment
Ensure maximum uptime through preventive & predictive maintenance
Develop and implement maintenance strategies, SOPs, and schedules
Handle breakdown analysis, RCA, and corrective/preventive actions
Utilities & Infrastructure
Oversee maintenance of Boilers, Compressors, Cooling Towers, DG Sets, HVAC, ETP/STP
Ensure uninterrupted availability of ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
Plan and execute daily production activities as per schedule and targets.
Monitor and control process parameters through Yokogawa DCS for smooth operations.
Ensure adherence to SOPs, safety standards, and environmental regulations.
Coordinate with maintenance, quality, and utility departments for seamless production.
Analyze process data to identify opportunities for process improvement and cost optimization.
Maintain and ...
3 Opening(s)
3.0 Year(s) To 10.0 Year(s)
2.00 LPA TO 3.50 LPA
Key Duties and Responsibilities• Design, Promote and Carry out Preventative Maintenance• Ensure all machines are safe and fit for purpose• Installation of new machines and equipment• Overhaul and upkeep and repair of all plant machines including;1. Tube Washer m/c.2. Fining m/c.3. Cab Furnace .4. All utility equipment’s like Air Compressor ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
Plan and execute daily production activities as per schedule and targets.
Monitor and control process parameters through Yokogawa DCS for smooth operations.
Ensure adherence to SOPs, safety standards, and environmental regulations.
Coordinate with maintenance, quality, and utility departments for seamless production.
Analyze process data to identify opportunities for process improvement and cost optimization.
Maintain and ...
2 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
Plan and execute daily production activities as per schedule and targets.
Monitor and control process parameters through Yokogawa DCS for smooth operations.
Ensure adherence to SOPs, safety standards, and environmental regulations.
Coordinate with maintenance, quality, and utility departments for seamless production.
Analyze process data to identify opportunities for process improvement and cost optimization.
Maintain and ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
To attain Breakdown maintenance of Plant machinery
Repairing of stand by Spares/part as per instructed by Executive.
To carryout continue work from shift.
Performed preventive maintenance activities as per plan & availability of machines in shift.
Maintain GMP document in online state.
Lubrication of utilities Pumping system.
To attain Breakdown maintenance of Plant machinery
Repairing of stand ...