Prepare, modify, and maintain engineering drawings using AutoCAD.
Develop GA drawings, P&IDs, equipment layouts, piping layouts, and fabrication drawings.
Support plant expansion, modification, and new project activities by preparing design documents.
Coordinate with Production, Maintenance, Utility, and Project teams to understand design requirements.
Conduct site visits for measurements, design verification, and drawing updates.
Review vendor ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 5.00 LPA
Responsibilities:1) Equipment Erection, Commissioning & Handover of Project as per timeline.2) Completion of Qualification Document & other QA Document of New Project as per timeline.3) Review and Analysis of Project Mechanical Drawing.4) Compliance to approved Permit system and ensuring safe work Practices and ensure "Zero"accident at Project sites.5) Mechanical Material ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 5.00 LPA
Responsibilities:1) Equipment Erection, Commissioning & Handover of Project as per timeline.2) Completion of Qualification Document & other QA Document of New Project as per timeline.3) Review and Analysis of Project Mechanical Drawing.4) Compliance to approved Permit system and ensuring safe work Practices and ensure "Zero"accident at Project sites.5) Mechanical Material ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Key Responsibilities:
Prepare 2D & 3D technical drawings using AutoCAD based on engineering inputs.
Develop and update P&ID (Piping & Instrumentation Diagrams) as per process and project requirements.
Interpret and apply P&ID symbols, ISA standards, and engineering conventions accurately.
Create, modify, and maintain:
Piping Layout Drawings
Equipment Layout Drawings
GA (General Arrangement) Drawings
Isometric Drawings
Utility Line Diagrams
Ensure all ...
1 Opening(s)
10.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
Key Responsibilities:
1. Project Planning & Execution
Plan, organize, and supervise all civil and structural works for greenfield, brownfield, and expansion projects.
Prepare BOQs, technical specifications, cost estimates, and project schedules.
Review and approve civil engineering drawings, layouts, and designs.
Coordinate with consultants, contractors, and vendors to ensure timely project completion.
2. Site Management
Oversee day-to-day site ...
2 Opening(s)
2.0 Year(s) To 10.0 Year(s)
1.80 LPA TO 10.00 LPA
Detailed Planning, Project Monitoring & Execution:
Collect all engineering drawings and project details. Assist in planning and executing site construction activities, including excavation, foundation work, structural work, and utilities installations. Conduct fortnightly review meetings with stakeholders.
Site Supervision: Oversee daily on-site civil works, ensuring compliance with design specifications, safety standards, and ...
1 Opening(s)
12.0 Year(s) To 15.0 Year(s)
13.00 LPA TO 18.00 LPA
Candidates having educational qualification of BE Civil Engineer and experience upto 13-15 years in API or Formulation industries. Expertise in the field of facility maintenance, Building Maintenance, Civil activity pertaining to plant modification or project management. He should be well conversant to requirement of Good Engineering Practice pertaining building & ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Job responsibility includes :
Planning, scheduling and managing installation of fermenters (upstream) ,vessels, piping, electrical & instrumentations, downstream equipment, HVAC ducting, utilities as per the P&ID or given drawings.
Should have experience in IQ,PQ,OQ.
Need to coordinate with all the material/equipment vendors and management team members.
Providing status updates, maintaining documentation records, co-ordinating with ...
2 Opening(s)
2.0 Year(s) To 6.0 Year(s)
3.00 LPA TO 4.00 LPA
1.Find, investigate and examine the location of the site and verify whether it is appropriate for construction purposes.
2.Review and approve project reports and designs.
3.While the project is undergoing, a civil engineer is also responsible for safety measures on site.
4.The civil engineer must also check if all tools and techniques like ...
6 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 4.00 LPA
Projects / Modifications - Suggest ideas, analyze & prepare cost/benefit report, discuss ; identify material/equipment/manpower, plan & implement project; Evaluate actual Vs planned benefits in order to reduce cost of production and improve productivity.
Conceptualizing Project execution plans after through discussion with User Departments.
Initiate Management of Change (MOC), carrying out GRA ...