89 Job openings found

1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 5.00 LPA
Basic knowledge of field instrumentsKnowledge of Control valve, pressure transmitter, flow transmitter, Temp. Transmitter, on/off valve, drives and panel wiring.Roles & Responsibilities:Knowledge of Preventive maintenance, ISO Documents.Knowledge of PLC and DCS systemsBasic knowledge of field instrumentsKnowledge of Control valve, pressure transmitter, flow transmitter, Temp. Transmitter, on/off valve, drives and panel ...
2 Opening(s)
3.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 5.00 LPA
Dear Team,   As per our telephonic talk request you to kindly work on critical position , details are as below :   No. of Positions : 1 Designation : Asst. Engineer Qualification : Dip. Instrumentation Exp.                 : 5 - 8 Years CTC                 : 2.4 TO 3.0 LPA (W.r.t Exp.) Joining time  : within 25 days Key Skill Set ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
1 Opening(s)
0 To 3.0 Year(s)
2.00 LPA TO 2.50 LPA
Key Result Areas Supporting Actions Upkeep :Monitor & coordinatemaintenance activities of VSFplant so as to achieve optimumproduction loss & delivery withintarget cost & quality Parameters.  Ensure the availability of instrument system to meet themanufacturing targets and other customer requirements Preventive Maintenance Schedule preparation & Evaluation Predictive Maintenance Check list preparation & ...
3 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
As Technician in continuous process industry; Coal based Thermal Power plant & Process Plant electrical equipment Operation & Maintenance & Condition Monitoring like VFDs, UPS Coal based Thermal Power plant CPP electrical operation & maintenance of electrical equipment like HT Alternator, AVR, HT Panel, PMCC, VFDs, On line UPS ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
4.00 LPA TO 10.00 LPA
Key Result Areas Supporting Actions Upkeep :Monitor & coordinatemaintenance activities of VSFplant so as to achieve optimumproduction loss & delivery withintarget cost & quality Parameters.  Ensure the availability of instrument system to meet themanufacturing targets and other customer requirements Preventive Maintenance Schedule preparation & Evaluation Predictive Maintenance Check list preparation & ...
5 Opening(s)
8.0 Year(s) To 13.0 Year(s)
4.00 LPA TO 7.00 LPA
Sr. No. Details 1 Working hand on experience with SCADA, PLC and DCS system 2 To handle green field/ Brown field project related to instrument 3 Understanding of P&IDs, (Piping and Instrument Diagram) 4 Preparation of I/O list 5 Preparation of logic for PLC/DCS system 6 Preparation of Specification/datasheet of field instruments 7 BOQ preparation of project related work 8 Evaluation of technical bid/ offers from vendors 9 Participation ...
1 Opening(s)
8.0 Year(s) To 13.0 Year(s)
10.00 LPA TO 15.00 LPA
Sr. No. Details 1 Working hand on experience with SCADA, PLC and DCS system 2 To handle green field/ Brown field project related to instrument 3 Understanding of P&IDs, (Piping and Instrument Diagram) 4 Preparation of I/O list 5 Preparation of logic for PLC/DCS system 6 Preparation of Specification/datasheet of field instruments 7 BOQ preparation of project related work 8 Evaluation of technical bid/ offers from vendors 9 Participation ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile