1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Diploma Mechanical/ Diploma Fabrication Technology/ BE Mechanical.
Exp :- 2 years to 3 years Max and not beyond that.
Should have Exp in Drafting(2D) and understanding of ASME design codes.
Prefablely should be able to ready Pv-elite reports and co-relate with drawings been prepared.
Good Communication skill would be add on.
Must be pro-active.
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Diploma Mechanical or diploma fabrication technology.
Exp :- 2 year to 2.5 years max and not beyond that.
Should have Exp in Heat Exchanger and pressure vessel industry only.
Should have certification of level UT, RT, DPT, Visual.
Should have done documentation for such job.
Should have handled TPI.
Must be pro-active.
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
Main Responsibilities? Executing the tendering process from vendor /contractor evaluation, floating bids, bidevaluation, techno-commercial meeting, negotiation, Preparing & awarding the Order orContract.? Complete procurement to pay Cycle for Following category of items / ServicesA. Engineering Purchase – Machine spares, PPRC pipe fitting, RO Spares Pumps & Furnitureetc.B. Electrical Purchase – ...
1 Opening(s)
4.0 Year(s) To 9.0 Year(s)
5.00 LPA TO 7.50 LPA
Main Responsibilities? Executing the tendering process from vendor /contractor evaluation, floating bids, bidevaluation, techno-commercial meeting, negotiation, Preparing & awarding the Order orContract.? Complete procurement to pay Cycle for Following category of items / ServicesA. Engineering Purchase – Machine spares, PPRC pipe fitting, RO Spares Pumps & Furnitureetc.B. Electrical Purchase – ...
1 Opening(s)
3.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
Sr. No.
Details
1
To Execute and monitor brown field projects, Capex jobs, modification job, process improvement jobs by understanding process.
2
Plant Layout set up by understanding operational requirement with project manager
3
Equipment’s detailing, Erection and commissioning of GLR, SSR, Tanks, Pumps, Heat Exchangers, Vessels, Columns, Blowers ANF, Dryer, etc along with schedule bar chart
4
Reading ...