2 Opening(s)
3.0 Year(s) To 8.0 Year(s)
4.00 LPA TO 5.00 LPA
1 To work in all 3 shifts on rotation basis & take responsibility of production with desiredQuality in safe operations.2 To maintain housekeeping of plant and surrounding area, Allocation of casual manpowereffectively.3 Organize tool box talk with the subordinates & other service departments.4 Preparation and closing of work permit & ...
3 Opening(s)
5.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 10.00 LPA
To work in all 3 shifts on rotation basis & take responsibility of production with desired Quality in safe operations.
To maintain housekeeping of plant and surrounding area, Allocation of casual manpower effectively.
Organize tool box talk with the subordinates & other service departments.
Preparation and closing of work permit & ensuring of ...
10 Opening(s)
3.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 6.00 LPA
Reporting in shift duties on rotational basis.
To give and take complete charge to reliever for pending and online activity.\
To maintain housekeeping of plant and surrounding area.
To perform any other activity assign by the HOD/Shift in-charge.
Reporting of incident, deviation, failure & involve in investigation.
Experience & knowledge of toxic chemicals like HF, ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 4.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapour Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility ...
4 Opening(s)
4.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 5.00 LPA
CAPEX pproposal and designing of brown and green field projects.
Preparing Basic Engineering Package consisting design basis document, material balance, energy balance, Utility calculations, development of Process Flow
Development of P&IDs and layout.
Preparing process datasheet for equipment’s like batch reactors, agitators, vessel, ANF, RVD, pumps, heat exchanger, storage tanks etc.
Technical reviewing of GA drawing for fabrication.
Reviewing techno commercial ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Find out the unsafe Act & Condition and report immediately toour department.? Preventive maintenance of firefighting equipment’s like firetender , fire pumps, Extinguishers, hydrant systems, watermonitors, foam monitors, safety showers etc.? Training on various subject like use of PPE’s & Use offirefighting equipment, SCBA, etc.? Active participant in Mock drill ...
1 Opening(s)
0 To 5.0 Year(s)
2.00 LPA TO 4.00 LPA
1. Joining Formalities1.1 Make comfort call before joining. Confirm timings, bus stop and driver detail and vehiclenumber.1.2 Inform security to provide guidance to settled in admin block (Security will allowed theredocuments and belongings except gadgets.1.3 Inform receptionist to provide required joining forms to new joinee. Receptionist will issuerefreshment coupons and ...
2 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 6.00 LPA
B R AGROTECH LTD, PANOLI
Department :- Quality Control
Designation- CHEMIST, SR. CHEMIST
Min. Qualification- B.sc/M.sc (Chemistry)
JOB RESPONSIBILITY
Key Criteria: Candidate should minimum 3 years of Experience in Agrochemical / Pesticides (Herbicide, Insecticide, Fungicide) products and their Formulations. Must be Knowledge of Kinds of Formulations in Pesticides. Also should be Knowledge of Principles ,Guidelines ,Limitations ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 7.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapour Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility ...
5 Opening(s)
5.0 Year(s) To 10.0 Year(s)
3.00 LPA TO 6.00 LPA
You will be responsible to Maintain the Utilities to support the Production Process of HDPE Jerry can manufacturing Unit.
Compression & Vapor Absorption Based Water Chillers, Air Conditioners, Air Handling Units, Cooling Towers, Air Compressors, Steam Boiler, Water Treatment Plant, Waste Water Treatment Plant, etc.
‘few pointwise roles and responsibility of utility manager.
1. ...