1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 5.00 LPA
Utility Operator Requirement with 2-5 Years’ Experience of Below Utility equipment and systems
Operational and maintenance Knowledge of Screw type Compressor Chilling Plant.
Operational and maintenance Knowledge of Screw type Compressor Brine Plant.
Operational and maintenance Knowledge of Cooling Tower.
Operational and maintenance Knowledge of screw type Air Compressor.
Operational and maintenance Knowledge of PSA Type Nitrogen ...
1 Opening(s)
3.0 Year(s) To 10.0 Year(s)
4.00 LPA TO 6.00 LPA
Technical Knowledge: Understanding of organic synthesis, dye chemistry, and industrial chemical processes.
Analytical Skills: Proficiency in UV-Vis spectrophotometry, pH meters, titration and color matching techniques.
Software Proficiency: Knowledge of ERP systems, laboratory data management and process automation tools is a plus.
Oversee and manage the preparation and production of chemical batches for basic ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
2.00 LPA TO 6.00 LPA
Experienced in Operation & maintenance of utilities like coal fired boiler, Coal fired thermic fluid heater, Screw chiller for chilled water, Screw chiller for Glycol, Process Chiller, Inst Air Compressor, Air dryer, N2 Generation plant, Cooling tower, Pumps, Blowers, Water Supply, Softner plant, Coal Handling system, Ash Handling system etc. ...
1 Opening(s)
8.0 Year(s) To 15.0 Year(s)
10.00 LPA TO 15.00 LPA
1) Job Purpose
Plan, organize, co-ordinate & control all the short term as well as long term activities required during execution of major expansion projects for Captive Power Plant, which are being undertaken at Grasim Cellulosic Division Vilayat (Bharuch) to meet VSF and Chemical Division Business objectives.
Coordinate, monitor Capex (Planning and ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
40.00 LPA TO 50.00 LPA
Should have knowledge of erection and commissioning of plant & machineries such as reactors, cooling tower, Boiler & other utilities.
Should have thorough knowledge of Preventive and break down maintenance of entire plant, machineries and utilities in chemical manufacturing unit.
To execute Green Field & Brown Field Projects.
Project planning & scheduling activities ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
Hand on experience on Plant machinery maintenance .
Sound knowledge on Preventive Maintenance, Corrective Maintenance and Shutdown Activities.
Maintenance works for various Mechanical rotating and static equipment’s like Air compressor, Air Dryer, Cooling Tower etc.
Maintenance work of Pumps, Blower, Agitator, Heat exchanger, Valves, Vessels, Steam & pipelines of Metallic and Non-Metallic MOC.
Compressor, ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 3.50 LPA
Good knowledge of repair and maintenance of process equipment like Pumps, Reactors, ATFD, ANFD, RVPD, RCVD, Powder transfer system, RO system, etc.
Good knowledge of utility equipment maintenance like Steam boiler, Air compressor, N2 gas generation plant, Thermic fluid heaters, Multiple effect evaporator, Cooling tower, Chilling plant, brine plant, vacuum system, ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Role, job contents, scope, responsibilities ITI-RFM with 2 to 3 years experience in Brine Chiller, water CHiller, water absorption matching, Utility Air Compressor activities, Nitrogen compressor and cooling tower. Likely position/Title Utility Operator Reporting to Shift Engg Education Ideal Acceptable ITI - RFM ITI - RFMTraining Ideal Acceptable Age Experience ...
4 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.00 LPA TO 5.00 LPA
Role, job contents, scope, responsibilities ITI-RFM with 2 to 3 years experience in Brine Chiller, water CHiller, water absorption matching, Utility Air Compressor activities, Nitrogen compressor and cooling tower. Likely position/Title Utility Operator Reporting to Shift Engg Education Ideal Acceptable ITI - RFM ITI - RFMTraining Ideal Acceptable Age Experience ...
5 Opening(s)
3.0 Year(s) To 7.0 Year(s)
3.00 LPA TO 5.00 LPA
1. Required Skills:
• Responsible for piping activities & Erection activities as per P&ID, ISO & GA drawing• Responsible for the erection of equipment like Chiller, Boiler, Reactors, Cooling tower, ANFD,Centrifuge, ETP & RO unit.• Responsible for commissioning activities & pre start up activities: Pneumatic/ Hydro as per processrequirement.• Responsible for ...